Nanten-en is a traditional ryokan with natural hot springs located deep the countryside yet just 40 minutes from central Osaka and 90 minutes from Kansai Airport.
The 100-year-old main building is a registered cultural property built in the style of a tea house and guests can experience traditional activities such as tea ceremony and Ikebana flower arranging.
It sits on the Koya Kaido, a 1,000-year-old pilgrimage road that leads to the UNESCO World Heritage Site of Koyasan. The surrounding villages are steeped in nearly 2.000 years of history and the rustic setting is a great contrast to the bright lights and noise of central Osaka.
The 100-year-old main building is a registered cultural property built in the style of a tea house and guests can experience traditional activities such as tea ceremony and Ikebana flower arranging.
It sits on the Koya Kaido, a 1,000-year-old pilgrimage road that leads to the UNESCO World Heritage Site of Koyasan. The surrounding villages are steeped in nearly 2.000 years of history and the rustic setting is a great contrast to the bright lights and noise of central Osaka.
- Tel
- 0721-68-8081
- Address
- 158 Amami, Kawachinagano, Osaka Prefecture 586-0062
- Map
-





- Message
- We hope that all our guests will fully enjoy their time at Nantenen. We hope to share the joy of our hot spring inn, representing the convergence of Japanese culture, with even more people.
- Check In/Out
- 15:00/10:00
- Facility
- Restaurant, Pool
- Services
- Free wifi, Massage, Parking lot, Take-out menus at restaurants, Kaiseki meals in the guests’ room (vegetarian and vegan available), Large bath and outdoor bath in private bungalow, Cultural experiences (tea ceremony, ikebana), Yukata (bathrobe), Hiking tours with native speaker guide, Rental bicycles
- Language
- English